Please use this identifier to cite or link to this item: http://10.9.150.37:8080/dspace//handle/atmiyauni/1080
Title: Development of a Simplified Mathematical Modelling for the Job Shop Scheduling to Calculate Makespan
Authors: Kagthara, M.
Bhatt, M.
Keywords: Job-Shop Scheduling
Mathematical modeling
Gantt chart
Makespan
Issue Date: 2017
Publisher: Journal of Production Research & Management(STM Journals)
Citation: Kagthara MS, Bhatt MG. Development of a Simplified Mathematical Modelling for the Job Shop Scheduling to Calculate Makespan. Journal of Production Research and Management. 2017; 7(1): 22–25p
Abstract: In this paper, mathematical modelling is prepared for job shop scheduling problem. Makespan is calculated using maximum machine time. Matlab algorithm is developed for mathematical modelling. Formula is tested using various case studies. Gantt chart is prepared for graphical representation of solution. Results have been verified for mathematical modelling using Gantt chart approach.
URI: http://10.9.150.37:8080/dspace//handle/atmiyauni/1080
ISSN: 2249-4766
Appears in Collections:01 Journal Articles

Files in This Item:
File Description SizeFormat 
1128) 13010_Manhar Sunderjibhai Kagathara.pdf390.51 kBAdobe PDFView/Open
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.