Please use this identifier to cite or link to this item: http://10.9.150.37:8080/dspace//handle/atmiyauni/1335
Title: Productivity Improvement Of Exhaust Gas Recirculating (EGR) Elbow By Using Value Stream Mapping Of Lean Manufacturing
Authors: Dabhi, Devendra M.
Issue Date: May-2022
Citation: Dabhi, D. M. (2022). Productivity Improvement Of Exhaust Gas Recirculating (EGR) Elbow By Using Value Stream Mapping Of Lean Manufacturing. Department of Mechanical Engineering Faculty of Engineering and Technology Atmiya University.
Abstract: The manufacturing industry is adopting lean manufacturing practices. Many manufacturers struggle to produce a product, produce the right products or services in the right place and timely delivery meeting. To survive in today's competitive world, manufacturers need to come up with innovative ways reducing production lead times to improve productivity and performance goal. Today, it is aimed at improving production performance by reducing production lead time and dissipation of existing production the most important goals for almost every manufacturing company. Each industry's shop floor contains multiple stations that work together to complete specific activities according to a timetable in order to fulfill the production rate. Machine breakdowns, inventory shortages, and tool shortages all cause delays in meeting demand. The only lean tool recommended in the literature to eliminate Muda, or bottlenecks, across the manufacturing line is value stream mapping. Before implementing techniques, value stream mapping uses a current state map to record the current status of the production line. The main purpose of this study is to design Effective Value Stream Mapping (VSM) to improve productivity in automobile part manufacturer company in to reduce lead time and establish a future state for the action plan's process improvement to sum up, the proposed Future Value Stream Map (FVSM) aids in the effective identification of inefficient activities and industrial processes, according to this research. By lowering the manufacturing lead time, VSM serves as an input for improvement. In current state value stream mapping lead time is 7 Days. Applying lean concept in production area and calculate the lead time for Future state is 3.02 days. So reduce lead time by 3.97 days.
URI: http://10.9.150.37:8080/dspace//handle/atmiyauni/1335
Appears in Collections:M.TECH ME Student Dissertation

Files in This Item:
File Description SizeFormat 
Productivity Improvement Of Exhaust Gas Recirculating (EGR) Elbow By Using Value Stream Mapping Of Lean Manufacturing.pdf2.77 MBAdobe PDFView/Open
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.