Please use this identifier to cite or link to this item: http://10.9.150.37:8080/dspace//handle/atmiyauni/572
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMehta, S.S.-
dc.contributor.authorPuranik, P.S.-
dc.contributor.authorVaishnav, A.V.-
dc.date.accessioned2020-08-25T11:20:10Z-
dc.date.available2020-08-25T11:20:10Z-
dc.date.issued2017-04-01-
dc.identifier.citationMehta, S. & Puranik, P. & Vaishnav, A. (2017). An Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information System.International Journal for Research in Applied Science & Engineering Technology.5(4), 1107-1115.https://www.ijraset.com/archive-detail.php?AID=56en_US
dc.identifier.issn2321-9653-
dc.identifier.urihttps://www.ijraset.com/archive-detail.php?AID=56-
dc.identifier.urihttp://10.9.150.37:8080/dspace//handle/atmiyauni/572-
dc.description.abstractThis paper depicts how Project Information System was used to eliminate Non Value Added Time in a manufacturing plant. A current Process Cycle Efficiency was measured and data for constructing the present Process Cycle Efficiency was collected through production line visits, interviews of employees and observation of machine’s function at different production stages. Different causes of Non Value Added Time was determined. Regression analysis with the help of Minitab software were applied to evaluate most affected causes of Non Value Added Time. At present, Process Cycle Efficiency was found 63.47%. In order to improve Process Cycle Efficiency and to Reduce Non Value Added Time it was proposed to implement Project Information System, it was evaluated that future state Process Cycle Efficiency would be improved to 70.88% at initial stage.en_US
dc.language.isoen_USen_US
dc.publisherInternational Journal for Research in Applied Science & Engineering Technologyen_US
dc.subjectProcess Cycle Efficiency, Non Value Added Time, Project Information Systemen_US
dc.titleAn Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information Systemen_US
dc.typeArticleen_US
Appears in Collections:01 Journal Articles

Files in This Item:
File Description SizeFormat 
An Approach to Reduce Non-Value Added Time.pdf368.51 kBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.