Please use this identifier to cite or link to this item: http://10.9.150.37:8080/dspace//handle/atmiyauni/751
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMaru, Darshak N.-
dc.contributor.authorAcharya, Shailee G.-
dc.contributor.authorSheladiya, Manojkumar V.-
dc.contributor.authorAcharya, G.D.-
dc.date.accessioned2021-09-04T06:36:35Z-
dc.date.available2021-09-04T06:36:35Z-
dc.date.issued2021-02-01-
dc.identifier.citationMaru, D. N., Acharya, S. G., Sheladiya, M. V., & Acharya, G. D. (2021). FROM DRIVING FORCES TO CHALLENGES–IMPLEMENTATION OF VALUE STREAM MAPPING FOR PRODUCTIVITY IMPROVEMENT. Industrial Engineering Journal (ISSN-0970-2555), 14(2), 10-23.en_US
dc.identifier.urihttps://iiiejournal.org/index.php/iiie/article/view/135-
dc.identifier.urihttp://10.9.150.37:8080/dspace//handle/atmiyauni/751-
dc.description.abstractIn the current increasingly competitive world of work, it is very important to constantly improve, to be efficient and effective, meeting with highquality standards. Lean Manufacturing tools are one of the most influential & most effective methodologies for eliminating wastes, controlling quality, and improving the overall performance of any process with the assurance of a large profit margin. The Value Stream Mapping (VSM) techniques involve flowcharting the steps, activities, material flows, information flows, and other process elements that are involved with a process of transformation. This thesis presents the current performance of output and capacity of the FEP bogie frame fabrication shop by accurate data collection through time study. In each workstation, the processing time is different and longer time-consuming workstations will be identified as a bottleneck. The identified bottleneck station will be analyzed to reduce the processing time, non-value-added activities, different wastes ultimately which increase production rate in the bogie frame fabrication shop.en_US
dc.language.isoen_USen_US
dc.publisherIndustrial Engineering Journal.en_US
dc.subjectFEP Bogie, Lean Tools, Value Stream Mapping (VSM), Productivity Improvement Techniquesen_US
dc.titleFrom Driving Forces To Challenges – Implementation of Value Stream Mapping For Productivity Improvementen_US
dc.typeArticleen_US
Appears in Collections:01 Journal Articles

Files in This Item:
File Description SizeFormat 
135-Article Text-167-1-10-20210314.pdf1.96 MBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.